Contents




               .3`Nuclear Power Production and Operation                       / 032



                  Abstract:  By the end of 2020,  China had 48 nuclear power units in commercial
             operation,  whose total installed capacity is approximately 49880 MWe,  ranking third
             in the world,  and distributed in 8 provinces along the coast. The annual nuclear power

             generation is 366.243 billion kW·h,  accounting for about 4.94% of the total national
             power generation. The annual average utilization hours of nuclear power is 7426.98

             hours,  and the average utilization rate of nuclear power equipment is 84.55%. All
             nuclear power plants operate safely and stably,  and no operational incidents of level
             2 or above occurred throughout the year. The full score ratio and average value of the
                 ഠ߶॓࿐໓ངԛϱഠϱಃ෮Ⴕ
             WANO composite index of China’s nuclear power units are both higher than those of
             major nuclear power countries,  and at the same time better than global units.
                  Keywords:  Nuclear power generation; nuclear power operationĠequipment

             utilization hoursĠ  WANO performance indicators







               .4`Nuclear Power Engineering Construction                       / 049



                  Abstract:  By the end of  2020,  China had 17 nuclear power units under
             construction,  with a total installed capacity of 18.525 million kilowatts. The installed
             capacity of nuclear power units under construction continued to rank fi rst in the world.

             In 2020,  China’s nuclear power projects under construction steadily promoted,  and
             completed a series of important project nodes. The project safety,  quality,  progress,

             investment,  technology,  environment protection and other aspects effectively
             controlled.
                  Keywords:Nuclear power project;  Project overview;  Construction progress