CGN Power’s 2025 Annual On-Grid Electricity Exceeds 232.6 Billion kWh
Time: 2026-04-13

On 26 March, CGN Power Co., Ltd. (CGN Power) held its 2025 annual performance briefing in Shenzhen. During this period, the 28 operating nuclear units under CGN Power maintained safe and reliable operation with no unplanned outage. The company delivered 232.648 billion kWh of electricity to the grid and began main engineering construction on six new units.

(Source: China General Nuclear Power Corporation)


你知道你的Internet Explorer是过时了吗?

为了得到我们网站最好的体验效果,我们建议您升级到最新版本的Internet Explorer或选择另一个web浏览器.一个列表最流行的web浏览器在下面可以找到.